Planned Project (I) Kanhar Pumped – Storage Hydroelectric
Project 1.1
Introduction Kanhar Hydroelectric Project would
be a part of Salient Features Location 1. State - 2. District - Palamau 3. River - Kanhar 4. Situation
(Dam) - Near 5. Forebay
Dam - Near 6. Power
House - Near 7. Police Station - Ranka 8. Sub-Division - Garhwa Reservoir at Baradih 1. Maximum water level (top of gate) - EL 414.33 M 2. Full reservoir level - EL 413.41 M 3. Dead storage level - EL 396.34 M 4. Gross storage at M.W.L. - 60.108 hect-metre 5. Storage at F.R.L. - 57897 hect-metre 6. Dead storage capacity - 5250 hect-metre 7. Live storage capacity - 52,647 hect metre 8. Reservoir area at F.R.L. - 6342 hect 9. Reservoir area at M.W.L. - 7012 hect Dam Baradih 1. Type of Dam - Rolled earth filled dam of non homogenous material Combined with masonary spillway. 2. Elevation of top of dam - 417.99 M 3. Maximum height of dam from foundation- 42.99 M 4. Lowest bed level of river - 374.69 M Spillway (Baradih) 1. Type of spillway - Ogee type 2. Length of spillway - 377.74 M 3. Spans - 16 nos. 4. Crest level - 404.42 M 5. Design head - 9.90 M 6. Design discharge - 15922 cumecs 7. Type of gate - Radial 8. Size of gate - 15.85 M X 9.91 M Canal (Main Trunk canal and others) 1. Gross command area - 1.58 lacs. hect. 2. Culturable command area - 0.67 lacs hect. 3. Design discharge at head
a) Main trunk canal - 63.92 cumecs b) Right high level canal - 7.54 cumecs c) Left high level canal - 5.86 cumecs d) Left low level canal - 39.38 cumecs e) Right low level canal - 8.10 cumecs 4. Bed width of canal at head a) Main trunk canal - 4.27 M b) Right high level canal - 10.67 M c) left high level canal - 8.23 M d) Left low level canal - 2.59 M e) Right low level canal - 10.98 M 5. Full supply depth of canal at head
a) Main trunk canal - 3.81 M b) Right high level canal - 1.22 M c) Left high level canal - 1.22 M d) Left low level canal - 3.35 M e) Right low level canal - 1.22 M 6. Lengths of canal
a) Main trunk canal - 28 K.M b) Right high level canal - 75.83 K.M. c) Left high level canal - 58.84 K.M. d) Left low level canal - 78.35 K.M. e) Right low level canal - 42.35 K.M. 7. Length initiated section a) Main trunk canal - 28 K.M. b) Right high level canal - c) Left high level canal - d) Left low level canal - 65.14 K.M. e) Right low level canal -
8. Length in unlined section a) b) Right high level canal - 75.83 K.M. c) Left high level canal - 58.84 K.M. d) Left low level canal - 13.21 K.M. e) Right low level canal - 42.35 K.M. 9. Intensity of Irrigation - 85% a) Maximum water level - 390.24 M. b) Full reservoir level - 390.24 M c) Minimum draw down level - 379.87 M d) Gross storage at FRL - 11.68 MM3 e) Live
storage at FRL - 9.305 MM3 f) Dead storage - 2.375 MM3 g) High of froebay dam - 28 M h) Length of forebay dam - 2 KM. i) Type of dam - Earthen, Masonary and concrete 10.
Lower Reservoir at Lowadoni
a) Full reservoir level - 291.15 M b) Minimum drawn-down level - 287.19 M c) Gross
storage at FRL - 11.40 MM3 d) Live storage at FRL - 6.00 MM3 e) Dead storage - 5.40 M M3 f) Type of dam - Earth filled 11.
Intake Structures a) Length - 105 M b) Type - 54 meters-concrete, 51 meters-Masonary c) Size of bell mouth opening - 8.25 M d) Trash Rack - Provided e) Gate - Full gate and stop log 12.
Spillway a) Type - Surface b) Length - 115 M c) Span - 7 Nos. d) Crest level - 388.64 M e) Design head - 1.5 M f) Design discharge - 345 Cumecs 13.
Penstocks/Pressure shafts
a) Diameter - 5500 MM (internal) b) Type - Steel liner Type c) Plate thickness - i)20mm to 28 mm-IS 2002 GR. 2A ii) 22 mm-IS 226 H.T.S. d) Length of penstock/pressure shaft- 410 meters 14.
Power House
a) Size - 27 m (wide) x 80m (long) x 43m (high) b) Type of Turbine - Vertical francis (reversible type) c) Nos. & size of Unit - 3 x 10 MW d) Diameter of Turbine - 5000 MW e) Centre Line of Units - EL 267.19m f) Machine hall level - EL 279.00mm g) S-bay floor level - EL 279.00m h) Top of power house - EL 298.00m 15. Tail Race System a) Minimum tail water level - EL 287.19m b) Maximum tail water level - EL 291.10m c) Size of tail race pool - 60 x 40m d) Slope of tail race pool - 1 in 2 e) Tail race channel bed width - 14 m f) Side slopes - 1 : 1.5
16.
Transmission line
220 KV Kanhar to Garhwa - 60 kms. (Feeder I & II) (Circuit length) 17. Power Generation -
a) Cost per KW installation - Rs. 8427.00 b) Annual Energy benefits - 373.7/Million Units c) System cost of energy generation - Rs. 0.61/kwh d) Nett financial returns - Rs. 3043.11 lacs/year e) Annual return - 12.04% (IV) Sankh Hydroelectric Project 0.1
Executive
Summary: · River Sankh, a major tributary of the Brahmani basin an area of 6478 km2 and in its 203 km. Long coarse drops from an elevation of +1037m to 192m. · The hydro power potential of the river can be developed in five stages. · Stage-II with an installed capacity of 186 MW can be taken up first in the development sequence, the planning and designs for stage II have been presented in the report (yield from Bihar Catchment). ·
Stage-II development envisages a dam at Turuma
where the river drains an area of 116 km2 ( ·
The 90% dependable yield of the river ( · The site is geologically suitable for construction of a rolled fill earth dam in the river portion with masonary gravity spillway on the right flank and masonary power dam on the left flank. · The dam extends over a length of 1236m and maximum height in earth dam portion is 47.05 m. · The portable maximum flood for which the spillway has been designed is 14600 cumecs. · The reservoir has a gross capacity of 867.62 million cumec at FRL 680m. · The Turuma, power house at the to of the dam on the left flank has an installed capacity of 2 units 3 MW each, and the tail race is let into a power channel. · The power channel from Turuma traverses 30.8 km. And empties into forebay at Budhamba. The Channel has a design discharge of 18 cumecs. · The Budhamba forebay dam has maximum height of 31.30 m extending over a length of 800m occupying two dykes on the left and is designed as a rolled fill earth dam. 20m waste weir have been provided at the forebay dam. · The forebay has a pondage of 1.9 million cumec catering to a day’s requirement. · The water conductor system comprises a head race tunnel 226.3 m log and a penstock 319m long. Bifurcating at the end of feed 2 units of 90 MW each. · The Sarubera power house has installed capacity of 2 units 90 MW each and the tail race is let into Kasnjor nala which joins Sankh finally. · The Sarubera power house with an average net head of 180m is considered ideal for operating as a peak load station with load factor of about 15%. · The estimated cost of the project is Rs. 526.70 crores. · The annual energy generation of both power houses is 271.30 Gwh in a 90% dependable year. · The project is scheduled to the completed in 7 years from start. · The cost of generation is estimated to Rs. 2.54 per kwh. 1.5
TURUMA
intake and penstock intake Type - Size and No. of events - 2.92m x 10.21 m – 2 nos. Crest level - EL 646.26m Penstock Numbers - Two nos. and one by-pass channel Diameter - 3.00m Length - 40 m Discharge - 18 cumecs each 1.6 TURUMA Power House Type - Surface Type of turbine - Kaplan-vertically mounted Installed capacity - 2 nos. x 3 MW Size of Power House - 29 m x 17 m Average net head - 27 m 1.6
Power
Channel Type - Open channel –lined Section - Trapezoidal Bed width - 3.0 m Side - slopes 1.25:1 Longitudinal - slopes 1.8,000 Full supply depth - 2.60m Free board - 0.75 m FSL inlet - EL 638.50m FSL outlet - EL 632.80m Design discharge - 18 cumecs No. of X-diagrams - 17 Length - 3.8 km. 1.8
BUDHAMBA
Forebay Dam Type - Rolled fill earth dam MDDL - +630.95m FRL - +633.50m Pondage - 1.9MM3 Bed level - EL 606.70m Top of dam - EL 638.00 m Height - 31.30m Length at top - EL 800m Top width - 9m 1.9
Waste
Weir Type - Ungated board crested weir Crest level - EL 633.50m Height - 2.50m Length at crest - 20 m 1.10 BUDHAMBA Intake Intake type - Size and No. of vents - 2 Nos. Crest level - EL 618m
1.11 Water
Conductor
Head race Tunnel - Length - 226.3m Discharge - 165 cumecs Size and shape - one no. 5.25m dia. Penstock Size and Number - One no. 5.25 m dia Length - 5.25m dia. 319m 1.12
Sarubera Power House
Type - Surface Type of turbine - Vertical shaft francis Size - 75m x 45m Installed capacity - 2Nos. x 90 MW Average net head - 180m Tail water level - EL 452.60m 1.13
Tail Race Channel
Type - Unlined open channel Section - Trapezoidal Bed width - 20m Longitudinal slope - 1 in 8000 Length - 1.90 Km Full supply depth - 4.00m Bed level at inlet - EL 448.50m 1.14 Abstract of Cost - (Based on Feb, 1996 price level) Amount in Rs. lakh – 52670 1.15 Construction period - 7 years 1.16 Power Generation -
Installed Capacity - 186 MW Turuma Power House - 2x3 MW Sarubera Power House - 2x90 MW Annual Generation - 90% dependable year Firm - 271.30 Gwh Secondary - 30.10 Gwh Cost of generation at Bus-Bar. Rs. 2.54/Kwh |