Projects Already Tendered

 

 

(1)    Dhoba Small Hydel Project ( 2x1000 KW)

 

 

 

1.         Name of the Project                  :          Dhoba SHP

 

2.         Location                                   :           RD 43.00 of Tirhut Main Canal

                                                                        Bagaha-II,    West Champaran,

                                                                        Bihar

 

3.         Capacity                                  :           2x1000 KW

 

4.         Source                                     :           Eastern Gandak Canal

 

5.         Maximum Discharge                 :           136.12 Cumecs.

 

6.         Flow at 50% Dependability      :           68.88 Cumecs

 

7.         Design Discharge                    :           63.91 Cumecs.

 

8.         Net Head                                  :           3.42 M

 

9.         Firm Power Potential at            :           1971.69 KW

            52.77% dependability 

 

10.       Max. Annual Generation at      :           11.57 Million Kwh.

            100% L.F.

 

11.       Max. Energy sent out               :           11.11 Million Kwh.

 

12.       Type of main plant and            :           Horizontal tubular with induction generator.

             equipment

 

13.       Mode of operation                   :           Grid connected

 

14.       Project cost                             :            Rs. 976.90 Lacs. Excl. IDC

 

15.       Generation cost                       :           Rs. 1.02/kwh

 

16.       Implementation schedule         :            22 months

 

 

(2)    Kattanya Small Hydel Project ( 2x1000 KW)

 

 

 

1.         Name of the Project                  :          Kattanya SHP

 

2.         Location                                   :           RD 79.00 of Tirhut Main Canal

                                                                        Bagaha-II,    West Champaran,

                                                                        Bihar

 

3.         Capacity                                  :           2x1000 KW

 

4.         Source                                     :           Eastern Gandak Canal

 

5.         Maximum Discharge                 :           135.10 Cumecs.

 

6.         Flow at 50% Dependability      :           67.86 Cumecs

 

7.         Design Discharge                    :           62.90 Cumecs

 

8.         Net Head                                  :           3.33 M

 

9.         Firm Power Potential at            :           1866.38 KW

            52.77% dependability 

 

10.       Max. Annual Generation at      :           11.39 Million Kwh.

            100% L.F.

 

11.       Max. Energy sent out               :           10.93 Million Kwh.

 

12.       Type of main plant and            :           Horizontal tubular with induction generator.

             equipment

 

13.       Mode of operation                   :           Grid connected

 

14.       Project cost                             :            Rs. 986.50 Lacs. Excl. IDC

 

15.       Generation cost                       :           Paise 104/kwh

 

16.       Implementation schedule         :            22 months

 

 

(3)    Barwal Small Hydel Project ( 2x800 KW)

 

 

 

1.         Name of the Project                  :          Barwal SHP

 

2.         Location                                   :           RD 124.0 of Tirhut Main Canal

                                                                        Bagaha-II,    West Champaran,

                                                                        Bihar

 

3.         Capacity                                  :           2x800 KW

 

4.         Source                                     :           Eastern Gandak Canal

 

5.         Maximum Discharge                 :           67.92 Cumecs.

 

6.         Flow at 50% Dependability      :           40.20 Cumecs

 

7.         Design Discharge                    :           36.73 Cumecs

 

8.         Net Head                                  :           4.40 M

 

9.        Max. Annual Generation at      :           8.71 Million Kwh.

           100% L.F.

 

10.       Max. Energy sent out               :           8.36 Million Kwh.

 

11.       Type of main plant and            :           Horizontal ‘S’ type induction generator.

             equipment

 

12.       Mode of operation                   :           Grid connected

 

13.       Project cost                             :            Rs. 800 lacs Excl. IDC

 

14.       Implementation schedule         :            22 months

 

 

(4)    Mathauli Small Hydel Project ( 2x400 KW)

 

 

 

1.         Name of the Project                  :          Mathauli SHP

 

2.         Location                                   :           RD 311.50 of Tirhut Main Canal

                                                                        Bagaha-II,    West Champaran,

                                                                        Bihar

 

3.         Capacity                                  :           2x400 KW

 

4.         Source                                     :           Eastern Gandak Canal

 

5.         Maximum Discharge                 :           78.70 Cumecs.

 

6.         Flow at 50% Dependability      :           22.00 Cumecs

 

7.         Design Discharge                    :           18.80 Cumecs.

 

8.         Net Head                                  :           3.93 M

 

9.         Firm Power Potential at            :           738.70 KW

            52.77% dependability 

 

10.       Max. Annual Generation at      :           4.19 Million Kwh

            100% L.F.

 

11.       Max. Energy sent out               :           4.02 Million Kwh.

 

12.       Type of main plant and            :           Horizontal tubular with induction generator.

             equipment

 

13.       Mode of operation                   :           Grid connected

 

14.       Project cost                             :            Rs. 546.60 Lacs. Excl. IDC

 

 

15.       Implementation schedule         :            22 months

 

 

 

 

 

 

 