( 2
) Dehra Small Hydel
Project (2x500 KW)
Salient Features
1.01
Sone canal system is one of the oldest canal systems in the
country. It is in operation since 1874.
1.02
The Dehra H.E. Project envisages to utilize the existing
fall of 2.50 meter on
Patna Branch
Canal at 18.12 Km. Main Canal for generation of Hydro Electric Power.
1.03
Location : Block – Obra Distt.
Aurangabad
1. Catchment
area of Sone river at the barrage : 69000 sq. km.
2. Water
Conductor System
(a)
Power Channel : 190.M, PCC lining
(b)
Tailrace Channel : 260 M, PCC lining
3. Power
House
(a)
Installed capacity : 2x500 KW.
(b) Type of
Unit : Semi Kaplan.
(c) Maximum
Head : 3.47 M
(d) Minimum
Head : 2.50 M
(e) Design
Head : 2.50 M
(f) Size of
P.H. : 18M x 8M x 8M
(g) Design
Discharge : 46.4 Cumecs.
(h) Annual
Energy generation : 6.95 GWH
4. Turbine(s)
: Semi Kapalan Syphon Intake Vertical turbine.
5. Generator
(s) : Synchronous Brushless,
electronic Governor
vertical generator.
6. Switch
Yard :
(a)
Transformer : 1 No., 1.250 MVA, 0.4/11
KV.
(b)
Size : 8M x 5M.
7.
Consultant : Alternate Hydro
Energy Centre,
Indian Institute of Technology,
Roorkee
( 3
) Sipaha Small
Hydel Project (2x500 KW)
Salient Features
1.04
Sone canal system is one of the oldest canal systems in the
country. It is in operation since 1874.
1.05
The Sipaha H.E. Project envisages to utilize the existing
fall of 3.20 meter on
Patna Branch
Canal at 33.80 Km. Main Canal for generation of Hydro Electric Power.
1.06
Location : Block – Daudnagar, Distt.
Aurangabad
1. Catchment
area of Sone river at the barrage : 69000 sq. km.
2. Water
Conductor System
(a)
Power Channel :
(b)
Tailrace Channel : 250 M, PCC lining
3. Power
House
(a)
Installed capacity : 2x500 KW.
(b) Type of
Unit : Semi Kaplan.
(c) Maximum
Head : 4.13 M
(d) Minimum
Head : 3.20 M
(e) Design
Head : 3.20 M
(f) Size of
P.H. : 16M x 12M x 8M
(g) Design
Discharge : 36.3 Cumecs.
(h) Annual
Energy generation : 6.86 GWH
4. Turbine(s)
: Semi Kapalan Syphon Intake Vertical turbine.
5. Generator
(s) : Synchronous Brushless,
electronic Governor
vertical generator.
6. Switch
Yard :
(a)
Transformer : 1 No., 1.250 MVA, 0.4/11
KV.
(b)
Size : 8M x 5M.
7.
Consultant : Alternate Hydro
Energy Centre,
Indian Institute of Technology,
Roorkee, Uttaranchal.
( 4
) Belsar Small
Hydel Project (2x500 KW)
Salient Features
1.07
Sone canal system is one of the oldest canal systems in the
country. It is in operation since 1874.
1.08
The Belsar H.E. Project envisages to utilize the existing
fall of 3.25 meter on
Patna Branch
Canal at 40.20 Km. Main Canal for generation of Hydro Electric Power.
1.09
Location : Block – Arwal, Distt. Jahanabad
1. Catchment
area of Sone river at the barrage : 69000 sq. km.
2. Water
Conductor System
(a)
Power Channel : 160.0 M, PCC lining
(b)
Tailrace Channel :
3. Power
House
(a)
Installed capacity : 2x500 KW.
(b) Type of
Unit : Semi Kaplan.
(c) Maximum
Head : 3.42 M
(d) Minimum
Head : 3.25 M
(e) Design
Head : 3.25 M
(f) Size of
P.H. : 16M x 12M x 8M
(g) Design
Discharge : 35.80 Cumecs.
(h) Annual
Energy generation : 6.03 GWH
4. Turbine(s)
: Semi Kapalan Syphon Intake Vertical turbine.
5.
Generator (s)
:
Synchronous Brushless, electronic
Governor vertical generator.
6. Switch
Yard :
(a)
Transformer : 1 No., 1.25 MVA, 0.4/11
KV.
(b)
Size : 6M x 4M.
7.
Consultant : Alternate Hydro
Energy Centre,
Indian Institute of Technology,
Roorkee, Uttaranchal.
( 5
) Paharma Small
Hydel Project (2x500 KW)
Salient Features
1.10
Sone canal system is one of the oldest canal systems in the
country. It is in operation since 1874.
1.11
The Paharma H.E. Project envisages to utilize the existing
fall of 7.70 meter on
Arrah Branch
Canal at 22.6 Km. main Canal for generation of Hydro Electric Power.
1.12
Location : Block – Gorari, Distt. – Rohtas (Sasaram)
1. Catchment
area of Sone river at the barrage : 69000 sq. km.
2. Water
Conductor System
(a)
Power Channel : 180.M, PCC lining
(b)
Tailrace Channel : 180 M, PCC lining
3. Power
House
(a)
Installed capacity : 2x500 KW.
(b) Type of
Unit : Semi Kaplan.
(c) Maximum
Head : 6.26 M
(d) Minimum
Head : 4.70 M
(e) Design
Head : 4.70 M
(f) Size of
P.H. : 16M x 8M x 8M
(g) Design
Discharge : 24.70 Cumecs.
(h) Annual
Energy generation : 8.0 GWH
4. Turbine(s)
: Semi Kapalan Syphon Intake Vertical turbine.
5. Generator
(s) : Synchronous Brushless,
electronic Governor
vertical generator.
6. Switch
Yard :
(a)
Transformer : 1 No., 1.25 MVA, 0.4/11
KV.
(b)
Size : 8M x 5M.
7.
Consultant : Alternate Hydro
Energy Centre,
Indian Institute of Technology,
Roorkee, Uttaranchal.
( 6 )
Walidad Small Hydel
Project (1x700 KW)
Salient Features
1.19
Sone canal system is one of the oldest canal systems in the
country. It is in operation since 1874.
1.20
The Walidad H.E. Project envisages to utilize the existing
fall of 3.90 meter on
Patna Branch
Canal at 57.54 Km. Main Canal for generation of Hydro Electric Power.
1.21
Location : Block – Arwal
1. Catchment
area of Sone river at the barrage : 69000 sq. km.
2. Water
Conductor System
(a)
Power Channel : 165.M, PCC lining
(b)
tailrace Channel : 180 M, PCC lining
3. Power
House
(a)
Installed capacity : 1x700 KW.
(b) Type of
Unit : Semi Kaplan.
(c) Maximum
Head : 5.0 M
(d) Minimum
Head : 3.9 M
(e) Design
Head : 3.9 M
(f) Size of
P.H. : 12M x 8M x 8M
(g) Design
Discharge : 28.9 Cumecs.
(h) Annual
Energy generation : 5.28 GWH
4. Turbine(s)
: Semi Kapalan Syphon Intake Vertical turbine.
5. Generator
(s) : Synchronous Brushless,
electronic Governor
vertical generator.
6. Switch
Yard :
(a)
Transformer : 1 No., 0.85 MVA, 0.4/11
KV.
(b)
Size : 8M x 5M.
(7)
Arwal Small Hydel
Project(1x500 KW)
Salient Features
1.01
Sone canal System is one of the oldest canal system in the
country. It is in operation since 1874.
1.02
The Arwal H.E. Project envisages to utilize the existing
fall of 3.20 meter on
Patna Branch
Canal at 68.4 km. Main canal for generation of Hydro Electric Power.
1.03
Location : Block-Arwal, Distt – Jehanabad.
1. Catchment
area of Sone river at the barrage : 69000 sq km.
2. Water
Conductor System
(a)
Power Channel : 165. M, PCC lining
(b)
tailrace Channel : 180 M, PCC lining
3. Power House
(a)
Installed capacity : 1x500 Kw.
(b)
Type of Unit : Semi Kaplan
(c)
Maximum Head : 3.98 M
(d)
Minimum Head : 3.20 M
(e)
Design Head : 3.20 M
(f)
Size of P.H. : 10M x 8M x 8M
(g)
Design Discharge : 18.12 Cumecs
(h)
Annual Energy Generation : 3.35 GWH
4. Turbine
(s) : Semi Kaplan Syphon Intake
Vertical Turbine
5.
Generator
:
Synchronous Brushless, Electronic Governor
vertical Generator
6. Switch
Yard
(a)
Transformer : 1 No. 0.625 MVA, 0.4/11 KV
(b)
Size : 8M x 5M.
(8)
Amethi Small Hydel
project (1x500 KW)
Salient Features
1.01
Sone canal systems in one of the oldest canal systems in
the country. It is in operation since 1874.
1.02
The Amethi H.E. Project envisages to utilize the existing
fall of 4.0 meter on Buxar Branch Canal at 15.2 Km. Main Canal for
generation of Hydro Electric Power.
1.03
Location : Block-Sanjhauli, Distt - Rohtas (Sasaram)
1. Catchment
area of SOne river at the barrage : 69000 sq. km.
2. Water
conductor System :
(a)
Power Channel : 110.M, PCC lining
(b)
Tailrace Channel : 200 M, PCC lining
3. Power House
(a)
Installed Capacity : 1x500 KW
(b)
Type of Unit : Semi Kaplan.
(c)
Maximum Head : 4.54 M
(d)
Minimum Head : 4.0 M
(e)
Design Head : 4.0 M
(f)
Size of P.H. : 10M x 8M x 8M
(g)
Design Discharge : 14.50 Cumecs.
(h)
Annual Energy Generation : 4.31 GWH
4. Turbine
(s) : Semi Kaplan Syphon Intake
Vertical Turbine.
5. Generator(s)
: Synchronous, Brushless, Electronic
Governor,
vertical Generator
6. Switch
Yard
(a)
Transformer : 1 No., 0.650 MVA, 0.4/11 KV.
(b)
Size : 8 M x 5M
(9)
Natwar Small Hydel
Project (1x400 KW)
1.01
Sone Canal
System is one of the oldest canal systems in the country. It is in
operation since 1874.
1.02
The Natwar H.E. Project envisages to utilize the existing
fall of 4.0 meter on
Buxar
Branch Canal at 28.6 km. Main Canal for generation of Hydro Electric
Power.
1.03
Location : Block-Dinara, Distt – Rohtas (Sasaram)
1. Catchment
area of Sone river at the barrage : 69000 sq. km.
2. Water
Conductor System :
(a)
Power Channel : 110 M, PCC lining
(b)
tailrace Channel : 180 M. PCC lining
3. Power
House
(a)
Installed capacity : 1x400 KW.
(b)
Type of Unit : Semi Kaplan
(c)
Maximum Head : 4.95 M
(d)
Minimum Head : 4.0 M
(e)
Design Head : 4.0 M
(f)
Size of P.H. : 10M x 8M x 8M
(g)
Design Discharge : 7.3 Cumecs
(h)
Annual Energy Generation : 2.18 GWH
4. Turbine(s)
: Semi Kaplan Syphon Intake Vertical Turbine
5. Generator(s)
: Synchronous Brushless, Electronic Governor
vertical Generator
6. Switch
Yard
(a)
Transformer : 1No., 0.325 MVA, 0.4/11 KV
(b)
Size : 8M x 5M
(10)
Rampur Small Hydel
Project (1 x 250 KW)
Salient Features
1.01
Sone Canal
System is one of the oldest canal systems in the country. It is in
operation since 1874.
1.02
The Rampur H.E. Project envisages to utilize the existing
fall of 3.0 meter on Buxar Branch canal at 21.4 km.
Main Canal
for generation of Hydro Electric Power.
1.03
Location : Block-Dinara, Distt – Rohtas (Sasaram)
1. Catchment
area of Sone river at the barrage : 69000 sq. km.
2. Water
Conductor System
(a)
Power Channel : 110 M, PCC lining
(b)
Tailrace Channel : 180 M. PCC lining
3. Power House
(a)
Installed capacity : 1x250 kw.
(b)
Type of Unit : Semi Kaplan
(c)
Maximum Head : 4.06 M
(d)
Minimum Head : 3.0 M
(e)
Design Head : 3.0 M
(f)
Size of P.H. : 10M x 8M x 8M
(g)
Design Discharge : 9.97 Cumecs
(h)
Annual Energy Generation : 2.13 GWH
4. Turbine(s)
: Semi Kaplan Syphon Intake Vertical
Turbine
5. Generator(s)
: Synchronous, Brushless, Electronic
Governor vertical Generator
6. Switch
Yard
(a)
Transformer : 1No., 0.325
MVA, 0.4/11 KV
(b)
Size : 8M x 5M
(11)
Rajapur Small Hydel
Project ( 1x700 KW)
1.01
Kosi Canal System is twenty seven year old canal systems in
Bihar. It is in operation since 1975.
1.02
The Rajapur H.E. Project envisages to utilize the existing
fall of 3.60 meter on
Koshi Branch
Canal at km. Main canal for generation of Hydro Electric Power.
1.03
Location : Block – Birpur, Distt – Supaul
1. Catchment
area of Sone river at the barrage : 69000 sq. km.
2. Water
Conductor System
(a)
Power Channel : 110 M, PCC lining
(b)
Tailrace Channel : 110 M, PCC lining
3. Power
House :
(a)
Installed Capacity : 1 x 700 KW
(b)
Type of unit : Semi Kaplan
(c)
Maximum Head : 4.43 M
(d)
Minimum Head : 3.6 M.
(e)
Design Head : 3.6 M
(f)
Size of P.H. : 12 M x 8M x 8M
(g)
Design Discharge : 7.3 Cumecs
(h)
Annual Energy Generation : 22.6 GWH
4. Turbine
(s) : Semi Kaplan Syphon Intake
vertical Turbine
5. Generator
(s) : Synchronous Brushless,
Electronic Governor
vertical generator
6. Switch
Yard
(a)
Transformer : 1 No. , 1.25 MVA, 0.4/11 KV
(b)
Size : 8M x 5M
|