Projects under construction

 

 

1.

Tejpura Small Hydel Project

(2x750 KW)

2.

Arwal Small Hydel Project

(1x500 KW)

3.

Amethi Small Hydel project

(1x500 KW)

4.

Natwar Small Hydel Project

(1x400 KW)

5.

Rampur Small Hydel Project

(1x250 KW)

6.

Rajapur Small Hydel Project

(1x700 KW)

7.

Belsar Small Hydel Project

(2x500 KW)

8.

Paharma Small Hydel Project

(2x500 KW)

9.

Bathnaha Phase-I Small Hydel Project

(8 MW)

10.

Nirmali Small Hydel Project

(7 MW)

11.

Dhoba Small Hydel Project

(2x1000 KW)

12.

Katanya Small Hydel Project

(2x1000 KW)

13. Mathauli Small Hydel Project

(2x400 KW)

14. Barwal Small Hydel Project

(2x800 KW)

15.

Walidad Small Hydel Project

(1x700 KW)

16.

Dehra Small Hydel Project

(2x500 KW)

17.

Sipaha Small Hydel Project

(2x500 KW)

 

 

        Tejpura Small Hydel Project (2x750 KW)

 

Salient Features

  

 

1.01          Sone Canal System is one of the oldest canal systems in the country. It is in operation since 1874.

 

1.02          The Tejpura 5th project envisages to utilize the existing fall of 4.25 M on Patna Branch Canal at 23.34 K.M. Main Canal for generation of Hydro Electric Power.

 

1.03          Location : Block – Obra, Distt. – Aurangabad.

 

 

1.         Catchment area of Sone river at the barrage              :           69000 sq. km.

 

2.         Water Conductor System        

                       

            (a) Power Channel                               :           180 M 

            (b) Tail Race Channel                          :           200 M.

 

3.         Power House              

           

            (a)        Head (m)                                  :          

            (b)        Maximum                                  :           5.22 M.

            (c)        Minimum                                  :           4.25 M.

            (d)        Design                                     :           4.25 M.

            (e)        Size of Power House                :           12 m x 8m x 8m.

                        (a) Installed Capacity               :           2 x 750 KW.

                        (b) Turbine(s) –Type of unit    :           Semi Kaplan

            (f)         Design Discharge                    :           41.0 Cumecs.

            (g)        Annual energy Discharge        :           11.27 GWH

 

4.         Turbine(s)                                            :           Semi Kaplan Syphon Intake, vertical 

                                                                                    Turbine.          

           

5.         Generation                                          :           Synchronous, Brushless, Electronic   

                                                                                    Governor vertical generator

 

6.         Switchyard                  

                       

            (a) Size                                                :           8m. x 5 m.

            (b) Transformer                                   :           1 No. 1.875 MVA, 0.4/11 KV.

 

7.         Consultants                                         :           Indian Institute of  Alternate Hydro

                                                                                    Energy Center, Roorkee -  227667

 

8.         Status of the Project                            :           Work awarded, proposed excavation  

                                                                                    work in May, 2002.

 

9.         Generation Equipment                         :          

 

10.       P.H.  Construction                                :           M/s. MECON, Ranchi

 

     

 Belsar Small Hydel Project (2x500 KW)

 

 

 

Salient Features

 

 

1.07          Sone canal system is one of the oldest canal systems in the country. It is in operation since 1874.

 

1.08          The Belsar H.E. Project envisages to utilize the existing fall of 3.25 meter on Patna Branch Canal at 40.20  Km. Main Canal for generation of Hydro Electric Power.

 

1.09          Location : Block – Arwal, Distt. Jahanabad

 

 

1.         Catchment area of Sone river at the barrage  :           69000 sq.  km.

 

2.         Water Conductor System

            (a)        Power Channel            :           160.0 M, PCC lining

            (b)        Tailrace Channel         :          

 

3.         Power House              

 

            (a) Installed capacity                :           2x500 KW.

            (b) Type of Unit                        :           Semi Kaplan.

            (c) Maximum Head                   :           3.42 M

            (d) Minimum Head                    :           3.25 M

            (e) Design Head                      :           3.25 M

            (f) Size of P.H.                          :           16M x 12M x 8M

            (g) Design Discharge               :           35.80 Cumecs.

            (h) Annual Energy generation :           6.03 GWH

 

4.         Turbine(s)                                :           Semi Kapalan Syphon Intake Vertical turbine.

 

5.         Generator (s)                           :           Synchronous Brushless, electronic

                                                                         Governor vertical generator.

 

6.         Switch Yard                              :          

 

            (a) Transformer                       :           1 No., 1.25 MVA, 0.4/11 KV.

            (b) Size                                    :            6M x 4M.

 

7.          Consultant                              :            Alternate Hydro Energy Centre,

                                                                         Indian Institute of Technology,

                                                                         Roorkee, Uttaranchal.

 

 

      Paharma Small Hydel Project (2x500 KW)

 

 

 

Salient Features

 

 

1.10          Sone canal system is one of the oldest canal systems in the country. It is in operation since 1874.

 

1.11          The Paharma H.E. Project envisages to utilize the existing fall of 7.70 meter on Arrah Branch Canal at 22.6  Km. main Canal for generation of Hydro Electric Power.

 

1.12          Location : Block – Gorari, Distt. – Rohtas (Sasaram)

 

 

1.         Catchment area of Sone river at the barrage  :           69000 sq.  km.

 

2.         Water Conductor System

            (a)        Power Channel            :           180.M, PCC lining

            (b)        Tailrace Channel         :           180 M, PCC lining

 

3.         Power House              

 

            (a) Installed capacity                :           2x500 KW.

            (b) Type of Unit                        :           Semi Kaplan.

            (c) Maximum Head                   :           6.26 M

            (d) Minimum Head                    :           4.70 M

            (e) Design Head                      :           4.70 M

            (f) Size of P.H.                          :           16M x 8M x 8M

            (g) Design Discharge               :           24.70 Cumecs.

            (h) Annual Energy generation :           8.0 GWH

 

4.         Turbine(s)                                :           Semi Kapalan Syphon Intake Vertical turbine.

 

5.         Generator (s)                           :           Synchronous Brushless, electronic Governor

                                                                         vertical generator.

 

6.         Switch Yard                              :          

 

            (a) Transformer                       :           1 No., 1.25 MVA, 0.4/11 KV.

            (b) Size                                    :           8M x 5M.

 

7.          Consultant                              :            Alternate Hydro Energy Centre,

                                                                         Indian Institute of Technology,

                                                                         Roorkee, Uttaranchal.

 

 

 

 

 

 Arwal Small Hydel Project(1x500 KW)

 

Salient Features

 

1.01          Sone canal System is one of the oldest canal system in the country. It is in operation since 1874.

 

1.02          The Arwal H.E. Project envisages to utilize the existing fall of 3.20 meter on Patna Branch Canal at 68.4 km. Main canal for generation of Hydro Electric Power.

 

1.03          Location : Block-Arwal, Distt – Jehanabad.

 

 

1.         Catchment area of Sone river at the barrage :           69000 sq km.

 

2.         Water Conductor System

 

            (a)        Power Channel            :           165. M, PCC lining

            (b)        tailrace Channel          :           180 M, PCC lining

 

3.         Power House

 

            (a)        Installed capacity         :          1x500 Kw.

            (b)        Type of Unit                 :           Semi Kaplan

            (c)        Maximum Head            :           3.98 M

            (d)        Minimum Head             :           3.20 M

            (e)        Design Head                :           3.20 M

            (f)         Size of P.H.                  :           10M x 8M x 8M

            (g)        Design Discharge        :           18.12 Cumecs

            (h)        Annual Energy Generation      :           3.35 GWH

 

4.         Turbine (s)                               :           Semi Kaplan Syphon Intake Vertical Turbine

 

5.         Generator                                :           Synchronous Brushless, Electronic Governor

                                                                                               vertical Generator

 

           

6.         Switch Yard                 

           

            (a) Transformer                       :           1 No. 0.625 MVA, 0.4/11 KV

            (b) Size                                    :           8M x 5M.

 

 

 

 

   Amethi Small Hydel project (1x500 KW)

 

 

Salient Features

 

 

1.01          Sone canal systems in one of the oldest  canal systems in the country. It is in operation since 1874.

 

1.02          The Amethi H.E. Project envisages to utilize the existing fall of 4.0 meter on Buxar Branch Canal at 15.2 Km. Main Canal for generation of Hydro Electric Power.

 

1.03          Location : Block-Sanjhauli, Distt  - Rohtas (Sasaram)

 

 

 

1.         Catchment area of SOne river at the barrage             :           69000 sq. km.

           

2.         Water conductor System         :

           

            (a)        Power Channel            :           110.M, PCC lining

            (b)        Tailrace Channel         :           200 M, PCC lining

 

3.         Power House

 

            (a)        Installed Capacity        :           1x500 KW

            (b)        Type of Unit                 :           Semi Kaplan.

            (c)        Maximum Head            :           4.54 M

            (d)        Minimum Head             :           4.0 M

            (e)        Design Head                :           4.0 M

            (f)         Size of P.H.                  :           10M x 8M x 8M

            (g)        Design Discharge        :           14.50 Cumecs.

            (h)        Annual Energy Generation      :           4.31 GWH

 

4.         Turbine (s)                               :           Semi Kaplan Syphon Intake Vertical Turbine.

 

5.         Generator(s)                            :           Synchronous, Brushless, Electronic Governor,                                                                         vertical Generator

 

6.         Switch Yard                 

 

            (a)        Transformer                 :           1 No., 0.650 MVA, 0.4/11 KV.

            (b)        Size                              :           8 M x 5M

 

 

 

   Natwar Small Hydel Project (1x400 KW)

 

 

1.01          Sone Canal System is one of the oldest canal systems in the country. It is in operation since 1874.

 

1.02          The Natwar H.E. Project envisages to utilize the existing fall of 4.0 meter on Buxar Branch Canal at 28.6 km. Main Canal for generation of Hydro Electric Power.

 

1.03          Location : Block-Dinara, Distt – Rohtas (Sasaram)

 

 

1.         Catchment area of Sone river at the barrage  :           69000 sq. km.

 

2.         Water Conductor System         :          

           

            (a)        Power Channel            :           110 M, PCC lining

            (b)        tailrace Channel          :           180 M. PCC lining

 

3.         Power House                          

 

            (a)        Installed capacity         :           1x400 KW.

            (b)        Type of Unit                 :           Semi Kaplan

            (c)        Maximum Head            :           4.95 M

            (d)        Minimum Head             :           4.0 M

            (e)        Design Head                :           4.0 M

            (f)         Size of P.H.                  :           10M x 8M x 8M

            (g)        Design Discharge        :           7.3 Cumecs

            (h)        Annual Energy Generation      :           2.18 GWH

 

4.         Turbine(s)                                :           Semi  Kaplan Syphon Intake Vertical Turbine

 

5.         Generator(s)                            :           Synchronous Brushless, Electronic Governor     

                                                                         vertical Generator       

6.         Switch Yard     

                       

            (a) Transformer                       :           1No., 0.325 MVA, 0.4/11 KV

            (b)        Size                              :           8M x 5M

 

 

 

  Rampur Small Hydel Project (1 x 250 KW)

 

 

Salient Features

 

1.01          Sone Canal System is one of the oldest canal systems in the country. It is in operation since 1874.

 

1.02          The Rampur H.E. Project envisages to utilize the existing fall of 3.0 meter on Buxar Branch canal at 21.4 km. Main Canal for generation of Hydro Electric Power.

 

1.03          Location : Block-Dinara, Distt – Rohtas (Sasaram)

 

 

 

1.         Catchment area of Sone river at the barrage  :           69000 sq. km.

 

2.         Water Conductor System

 

            (a)        Power Channel                        :           110 M, PCC lining

            (b)        Tailrace Channel                     :           180 M. PCC lining

 

3.         Power House

 

            (a)        Installed capacity                     :           1x250 kw.

            (b)        Type of Unit                             :           Semi Kaplan

            (c)        Maximum Head                        :           4.06 M

            (d)        Minimum Head                         :           3.0 M

            (e)        Design Head                            :           3.0 M

            (f)         Size of P.H.                              :           10M x 8M x 8M

            (g)        Design Discharge                    :           9.97 Cumecs

            (h)        Annual Energy Generation      :           2.13 GWH

 

4.         Turbine(s)                                            :           Semi Kaplan Syphon Intake Vertical

                                                                                     Turbine

 

5.         Generator(s)                                        :           Synchronous, Brushless, Electronic 

                                                                                    Governor vertical Generator

 

6.         Switch Yard                 

           

            (a) Transformer                                   :           1No., 0.325 MVA, 0.4/11 KV

            (b)        Size                                          :           8M x 5M