Tejpura Small Hydel Project (2x750 KW)
Salient Features
1.01
Sone
Canal System is one of the oldest canal systems in the country. It is in
operation since 1874.
1.02
The Tejpura 5th project envisages to utilize the
existing fall of 4.25 M on
Patna Branch
Canal at 23.34 K.M. Main Canal for generation of Hydro Electric Power.
1.03
Location : Block – Obra, Distt. –
Aurangabad.
1.
Catchment area of Sone river at the barrage
: 69000 sq.
km.
2. Water
Conductor System
(a) Power Channel
: 180 M
(b) Tail Race Channel
: 200 M.
3. Power
House
(a) Head (m)
:
(b) Maximum
: 5.22 M.
(c) Minimum
: 4.25 M.
(d) Design
: 4.25 M.
(e) Size of Power House
: 12 m x 8m
x 8m.
(a) Installed Capacity
: 2 x 750
KW.
(b) Turbine(s) –Type of unit :
Semi Kaplan
(f) Design Discharge
: 41.0
Cumecs.
(g) Annual energy Discharge
: 11.27 GWH
4.
Turbine(s)
: Semi
Kaplan Syphon Intake, vertical
Turbine.
5.
Generation
:
Synchronous, Brushless, Electronic
Governor vertical
generator
6.
Switchyard
(a) Size
: 8m. x 5 m.
(b) Transformer
: 1 No.
1.875 MVA, 0.4/11 KV.
7.
Consultants
: Indian
Institute of Alternate Hydro
Energy Center, Roorkee
- 227667
8.
Status of the Project
: Work
awarded, proposed excavation
work in May, 2002.
9.
Generation Equipment
:
10. P.H.
Construction
: M/s. MECON,
Ranchi

Belsar
Small Hydel Project (2x500 KW)
Salient Features
1.07
Sone canal system is one of the oldest canal systems in the
country. It is in operation since 1874.
1.08
The Belsar H.E. Project envisages to utilize the existing
fall of 3.25 meter on
Patna Branch
Canal at 40.20 Km. Main Canal for generation of Hydro Electric
Power.
1.09
Location : Block – Arwal, Distt. Jahanabad
1.
Catchment area of Sone river at the barrage :
69000 sq. km.
2.
Water Conductor System
(a) Power Channel
: 160.0 M,
PCC lining
(b) Tailrace Channel
:
3.
Power House
(a) Installed capacity
: 2x500 KW.
(b) Type of Unit
: Semi
Kaplan.
(c) Maximum Head
: 3.42 M
(d) Minimum Head
: 3.25 M
(e) Design Head
: 3.25 M
(f) Size of P.H.
: 16M x 12M
x 8M
(g) Design Discharge
: 35.80
Cumecs.
(h) Annual Energy generation :
6.03 GWH
4.
Turbine(s)
: Semi
Kapalan Syphon Intake Vertical turbine.
5.
Generator (s)
:
Synchronous Brushless, electronic
Governor vertical generator.
6.
Switch Yard
:
(a) Transformer
: 1 No.,
1.25 MVA, 0.4/11 KV.
(b) Size
: 6M x
4M.
7.
Consultant :
Alternate Hydro Energy Centre,
Indian Institute of Technology,
Roorkee, Uttaranchal.

Paharma Small Hydel Project (2x500 KW)
Salient Features
1.10
Sone canal system is one of the oldest canal systems in the
country. It is in operation since 1874.
1.11
The Paharma H.E. Project envisages to utilize the existing
fall of 7.70 meter on
Arrah Branch
Canal at 22.6 Km. main Canal for generation of Hydro Electric
Power.
1.12
Location : Block – Gorari, Distt. – Rohtas (Sasaram)
1.
Catchment area of Sone river at the barrage :
69000 sq. km.
2.
Water Conductor System
(a) Power Channel
: 180.M, PCC
lining
(b) Tailrace Channel
: 180 M, PCC
lining
3.
Power House
(a) Installed capacity
: 2x500 KW.
(b) Type of Unit
: Semi
Kaplan.
(c) Maximum Head
: 6.26 M
(d) Minimum Head
: 4.70 M
(e) Design Head
: 4.70 M
(f) Size of P.H.
: 16M x 8M x
8M
(g) Design Discharge
: 24.70
Cumecs.
(h) Annual Energy generation :
8.0 GWH
4.
Turbine(s)
: Semi
Kapalan Syphon Intake Vertical turbine.
5.
Generator (s)
:
Synchronous Brushless, electronic Governor
vertical generator.
6.
Switch Yard
:
(a) Transformer
: 1 No.,
1.25 MVA, 0.4/11 KV.
(b) Size
: 8M x 5M.
7.
Consultant
:
Alternate Hydro Energy Centre,
Indian Institute of Technology,
Roorkee, Uttaranchal.

Arwal
Small Hydel Project(1x500 KW)
Salient Features
1.01
Sone canal System is one of the oldest canal system in the
country. It is in operation since 1874.
1.02
The Arwal H.E. Project envisages to utilize the existing
fall of 3.20 meter on
Patna Branch
Canal at 68.4 km. Main canal for generation of Hydro Electric Power.
1.03
Location : Block-Arwal, Distt – Jehanabad.
1.
Catchment area of Sone river at the barrage :
69000 sq km.
2.
Water Conductor System
(a) Power Channel
: 165. M,
PCC lining
(b) tailrace Channel
: 180 M, PCC
lining
3.
Power House
(a) Installed capacity
: 1x500 Kw.
(b) Type of Unit
: Semi
Kaplan
(c) Maximum Head
: 3.98 M
(d) Minimum Head
: 3.20 M
(e) Design Head
: 3.20 M
(f) Size of P.H.
: 10M x 8M x
8M
(g) Design Discharge
: 18.12
Cumecs
(h) Annual Energy Generation
: 3.35 GWH
4.
Turbine (s)
: Semi
Kaplan Syphon Intake Vertical Turbine
5.
Generator
:
Synchronous Brushless, Electronic Governor
vertical Generator
6.
Switch Yard
(a) Transformer
: 1 No.
0.625 MVA, 0.4/11 KV
(b) Size
: 8M x 5M.

Amethi Small Hydel
project (1x500 KW)
Salient Features
1.01
Sone canal systems in one of the oldest canal systems
in the country. It is in operation since 1874.
1.02
The Amethi H.E. Project envisages to utilize the existing
fall of 4.0 meter on Buxar Branch Canal at 15.2 Km. Main Canal for
generation of Hydro Electric Power.
1.03
Location : Block-Sanjhauli, Distt - Rohtas (Sasaram)
1.
Catchment area of SOne river at the barrage
: 69000 sq.
km.
2.
Water conductor System :
(a) Power Channel
: 110.M, PCC
lining
(b) Tailrace Channel
: 200 M, PCC
lining
3.
Power House
(a) Installed Capacity
: 1x500 KW
(b) Type of Unit
: Semi
Kaplan.
(c) Maximum Head
: 4.54 M
(d) Minimum Head
: 4.0 M
(e) Design Head
: 4.0 M
(f) Size of P.H.
: 10M x 8M x
8M
(g) Design Discharge
: 14.50
Cumecs.
(h) Annual Energy Generation
: 4.31 GWH
4.
Turbine (s)
: Semi
Kaplan Syphon Intake Vertical Turbine.
5.
Generator(s)
:
Synchronous, Brushless, Electronic
Governor,
vertical Generator
6.
Switch Yard
(a) Transformer
: 1 No.,
0.650 MVA, 0.4/11 KV.
(b) Size
: 8 M x 5M

Natwar Small Hydel
Project (1x400 KW)
1.01
Sone Canal
System is one of the oldest canal systems in the country. It is in
operation since 1874.
1.02
The Natwar H.E. Project envisages to utilize the existing
fall of 4.0 meter on
Buxar
Branch Canal at 28.6 km. Main Canal for generation of Hydro Electric
Power.
1.03
Location : Block-Dinara, Distt – Rohtas (Sasaram)
1.
Catchment area of Sone river at the barrage :
69000 sq. km.
2.
Water Conductor System :
(a) Power Channel
: 110 M, PCC
lining
(b) tailrace Channel
: 180 M. PCC
lining
3.
Power House
(a) Installed capacity
: 1x400 KW.
(b) Type of Unit
: Semi
Kaplan
(c) Maximum Head
: 4.95 M
(d) Minimum Head
: 4.0 M
(e) Design Head
: 4.0 M
(f) Size of P.H.
: 10M x 8M x
8M
(g) Design Discharge
: 7.3 Cumecs
(h) Annual Energy Generation
: 2.18 GWH
4.
Turbine(s)
: Semi
Kaplan Syphon Intake Vertical Turbine
5.
Generator(s)
:
Synchronous Brushless, Electronic Governor
vertical Generator
6.
Switch Yard
(a) Transformer
: 1No.,
0.325 MVA, 0.4/11 KV
(b) Size
: 8M x 5M

Rampur Small Hydel
Project (1 x 250 KW)
Salient Features
1.01
Sone Canal
System is one of the oldest canal systems in the country. It is in
operation since 1874.
1.02
The Rampur H.E. Project envisages to utilize the existing
fall of 3.0 meter on Buxar Branch canal at 21.4 km.
Main Canal
for generation of Hydro Electric Power.
1.03
Location : Block-Dinara, Distt – Rohtas (Sasaram)
1.
Catchment area of Sone river at the barrage :
69000 sq. km.
2.
Water Conductor System
(a) Power Channel
: 110 M, PCC
lining
(b) Tailrace Channel
: 180 M. PCC
lining
3.
Power House
(a) Installed capacity
: 1x250 kw.
(b) Type of Unit
: Semi
Kaplan
(c) Maximum Head
: 4.06 M
(d) Minimum Head
: 3.0 M
(e) Design Head
: 3.0 M
(f) Size of P.H.
: 10M x 8M x
8M
(g) Design Discharge
: 9.97
Cumecs
(h) Annual Energy Generation
: 2.13 GWH
4.
Turbine(s)
: Semi
Kaplan Syphon Intake Vertical
Turbine
5.
Generator(s)
:
Synchronous, Brushless, Electronic
Governor vertical
Generator
6.
Switch Yard
(a) Transformer
: 1No.,
0.325 MVA, 0.4/11 KV
(b) Size
: 8M x 5M


|