SALIENT FEATURES
|
1.0 |
LOCATION |
|
|
|
Country |
India |
|
|
State |
Bihar |
|
|
District |
Supaul |
|
|
Sub Division |
Supaul |
|
|
Block |
Bhaptiahi |
|
|
River |
Kosi |
|
|
Project Area |
|
|
|
Longitude |
E 860 47’ |
|
|
Latitude |
N 260 24’ |
|
|
Access to the Project |
Supaul–Bhaptiahi Road (SH) on left bank Nirmali–Kanauli embankment Road on right bank |
|
|
Nearest Village |
Piprahi (Dagmara) on right bank Simari (Bhiptiahi) on left bank |
|
|
Airport |
Patna – 350 km |
|
|
Nearest Rail Head |
Supaul – 20 km on left bank Nirmali – 22.5 km on right bank |
|
|
Port |
Kolkata |
|
2.0 |
SCHEME |
|
|
|
Type |
Run of the River |
|
|
Installed Capacity |
5 x 25 MW |
|
3.0 |
HYDROLOGY |
|
|
|
Catchment Area (Upto Hanuman Nagar) |
61,816 sq. km. |
|
|
Maximum Annual Rainfall |
2191 mm |
|
|
Minimum Annual Rainfall |
1291 mm |
|
|
Maximum Intensity (1 Day) at Birpur |
318.5 mm |
|
|
Maximum Design Flood (At Hanuman Nagar Barrage) |
26897 cumec |
|
|
Annual Average Sediment Load (1973-81) |
57.35 gm/litre. |
|
4.0 |
POWER POTENTIAL |
|
|
|
FRL |
70.0 m |
|
|
MDDL |
68.5 m |
|
|
Gross Head |
5.50 m |
|
|
Net Head |
5.00 m |
|
|
Discharge available for power generation |
2832 m3/sec |
|
|
Installed Capacity |
6 x 21 MW |
|
|
Annual Energy Generation |
347 MU |
|
5.0 |
DIVERSION STRUCTURE |
|
|
|
Type of Diversion Structure |
Barrage |
|
6.0 |
POWER HOUSE |
|
|
|
Type |
Surface Type |
|
|
Size |
89 m (Width) x 176 m (Length) |
|
|
Turbine Centre Line Level |
EL 53.0 m |
|
|
Machine Hall Level |
EL 68.25 m |
|
|
Service Bay Level |
EL 68.25 m |
|
|
Design Discharge per unit |
472 cumec |
|
7.0 |
TYPE OF TURBINE |
|
|
|
Type |
Bulb |
|
|
Rated Discharge |
472 m3/sec |
|
|
Number |
6 |
|
|
Capacity |
21 MW |
|
8.0 |
GENERATOR |
|
|
|
Type |
Synchronous |
|
|
Capacity |
23333 KVA each |
|
|
Number |
6 |
|
|
Power Factor |
0.9 |
|
|
Frequency |
50 Hz |
|
|
Number of Phases |
3 |
|
|
Voltage |
11 KV |
|
9.0 |
STEP UP TRANSFORMER |
|
|
|
Type |
Outdoor type OFWF |
|
|
Quantity |
6 |
|
|
Capacity |
23.35 MVA 3-Phase |
|
|
Voltage Ratio |
11 / 132 KV |
|
10.0 |
TIME OF COMPLETION |
4 Years |
|
|
TAIL RACE CHANNEL AND DRAFT TUBE GATE |
|
|
|
Width and Length of Tail Race Channel per unit |
22.6 m x 48.75 m |
|
|
No of Gates Provided |
Two nos. |
|
|
Size of Draft Tube Gate |
10.3 m x 9.0 m |
|
|
No & Size of Draft Gate Openings |
6 nos of 19.0 m x 13 m |
|
|
Sill Level of Gate |
56.0 m |
|
|
Design Discharge per unit of in TRC |
472 cumec |
|
|
Bottom of Draft Tube |
El 46.75 m |
|
|
Max TWL/Flood Level |
EL 66.0 m |
|
|
Normal TWL |
EL 64.0 m |
|
|
TW weir Level |
EL 61.0 m |
|
11.0 |
INTAKE CHANNEL |
|
|
|
Width of Intake channel per unit |
22.6 m |
|
|
Length of Intake channel |
76.25 m |
|
|
Design Discharge per unit in the channel |
472 cumec |
|
|
No of intake gates |
2 x 6 nos |
|
|
Sill Level of Gate |
58.0 m |
|
|
Intake Level – a) Overt b) Invert |
63.25 m 42.75 m |
|
|
Intake weir Level |
62.0 m |
|
12.0 |
SWITCHYARD |
|
|
|
Type |
Open |
|
|
Size |
70.0 m x 135.0 m |
|
|
Location |
On the Left Bank side downstream of Power house. |
|
13.0 |
TRANSMISSION LINE |
|
|
|
Voltage for Transmission line |
132 KVA |
|
|
Length of Transmission Line |
30 Kms |
|
|
Name of Substation where power is finally dispatched |
Supaul |
|
14.0 |
BARRAGE |
|
|
|
Type |
R.C.C Raft with piers & gates |
|
|
Top Elevation of Pier |
EL 72.0 m |
|
|
Crest Elevation for Spillway bays |
EL 62.0 m |
|
|
Crest Elevation for under sluice bays |
EL 61.0 m |
|
|
Upstream Floor level in Spillway bays |
EL 61.0 m |
|
|
Downstream Floor Level in Spillway at C.C Block apron |
EL 57.40 m |
|
|
Upstream Floor Level in Under sluice bays |
61.0 m |
|
|
Downstream Floor Level in under sluice bays at C.C blocks apron |
56.34 m |
|
|
Stilling Basin floor level in Spillway bays |
55.0 m |
|
|
Stilling basin floor level under sluice bays |
54.0 m |
|
|
Length of concrete floor in under sluice |
83.58 m |
|
|
Length of Concrete Floor in Spillway |
80.20 m |
|
|
Length of Each span between piers |
18.0 m |
|
|
No of spans in Spillway |
35 |
|
|
No of Spans in under sluice |
6 +2 nos for bypass gates |
|
|
Thickness of upstream floor |
1.50 m |
|
|
Thickness of downstream floor |
2.0 m |
|
|
Thickness of pier |
2 m |
|
|
Height of Barrage gates |
8 m in spillway and 9 m in under sluice |
|
|
Design Discharge of spillway and under sluice bays |
27000 cumecs |
|
|
Energy Dissipator |
Hydraulic jump type Stilling Basin |
|
15.0 |
DIVERSION ARRANGEMENT |
|
|
|
Type |
Diversion Channel and Coffer Dam |
|
|
Diversion Capacity |
3160 cumecs |
|
|
Diversion Flood |
1 in 25 Yrs Flood |
|
|
Coffer Dam type |
Earthen with clay blanket on upstream side |
|
|
Height of Coffer Dam |
3.5 m |
|
16.0 |
BARRAGE POND |
|
|
|
Full Pond Level (FRL) |
EL 70.0 m |
|
|
Min Draw Down Level (MDDL) |
EL 68.5 m |
|
|
Gross Storage |
300 MCM |
|
|
Live Storage between MDDL and FRL |
100 MCM |
|
|
Area under submergence at FRL |
9000 ha |
|
17.0 |
COST OF PROJECT |
|
|
|
Cost of Project |
Rs. 1580.95 Crores |
|
|
Cost of Civil Works |
Rs. 1291.58 Crores |
|
|
Cost of E & M Works |
Rs. 289.37 Crores |
|
18.0 |
LEVELLISED TARIFF |
|
|
|
a) Present condition of development |
Rs. 5.33/KWh |
|
|
b) Without Kosi High Dam but with full development of Hanuman Nagar Barrage canal system. |
Rs. 6.94 / KWh |
|
|
c) With Kosi High Dam and with full development of all canal commands downstream of proposed Kosi High Dam |
Rs.6.24 /KWh |
| I |