SALIENT FEATURES
|
1. Location
|
|
|
|
(i) State |
: |
Bihar |
|
(ii) District |
: |
Madhepura |
|
(iii) River |
: |
Arar Dhar - an old source of Kosi River
|
|
1.1 Project Area
|
|
|
|
(i) Latitude |
: |
N 25047’ |
|
(ii) Longitude |
: |
E 86053’ |
|
(iii) Access to the project |
: |
Madhepura-Udakishanganj Road |
|
(iv) Nearest Village |
: |
Arar Ghat |
|
(v) Rail Head |
: |
Madhepura |
|
(vi) Port |
: |
Kolkata |
|
(vii) Airport |
: |
Patna – 280 km |
|
2 Scheme Type |
|
|
|
(i) Type |
: |
Run-of-the-River with peaking -24 hours during monsoon months and varying number of hours during rest of the months |
|
(ii) Installed capacity |
: |
(4 X 3 MW) = 12 MW |
|
3. Hydrology
|
|
|
|
(i) Maximum Annual Rainfall |
: |
2191 mm |
|
(ii) Minimum Annual Rainfall |
: |
1291 mm |
|
(iii) Maximum Intensity (one day) at Birpur |
: |
318.5 mm |
|
4. Power Potential
|
|
|
|
(i) Gross Head |
: |
6m |
|
(ii) Net Head |
: |
4.50m |
|
(iii) Discharge available for power generation |
: |
300 m3/sec (During Monsoon) 150 m3/sec (During Non-Monsoon) 75 m3/sec (During Lean Season)
|
|
(iv) Installed Capacity |
: |
4 x 3 MW = 12 MW |
|
(v) Annual Energy Generation |
: |
64.8 MW |
|
5. Diversion Structure
|
|
|
|
(i) Type of Diversion Weir |
: |
Gated Barrage |
|
(ii) Length of Barrage including spillway and under sluice bays |
: |
59.75m |
|
(iii) No. of Gates |
: |
7 Nos. |
|
(iv) Size of Gates |
: |
7.25 m (W) x 5.7 m (H) |
|
(v) Type |
: |
Vertical lift |
|
(vi) Thickness of each pier |
: |
1.50 m |
|
6. Power House
|
|
|
|
(i) Type |
: |
Surface, toe of the dam type |
|
(ii) Size |
: |
50 m (L) x 28 m (W) x 22.50 m (H) above Generator Floor |
|
(iii) Service Bay level |
: |
EL 95.00 m |
|
(iv) Machine Hall Floor Level |
: |
EL 84.50 m |
|
(v) Installed Capacity |
: |
(4x3 MW) = 12 MW |
|
7. Turbine
|
|
|
|
(i) Type |
: |
Tubular / Bulb or Pit type |
|
(ii) Rated Discharge |
: |
75 m3/s |
|
(iii) Number of Turbines |
: |
4 |
|
(iv) Capacity |
: |
3 MW each |
|
(v) Rotational Speed |
: |
107 rpm
|
|
8. Generator
|
|
|
|
(i) Type |
: |
Synchronous |
|
(ii) Capacity |
: |
3.75 MVA |
|
(iii) Number of units |
: |
4 |
|
(iv) Power Factor |
: |
0.8 |
|
(v) Frequency |
: |
50 Hz |
|
(vi) Number of Phases |
: |
3 |
|
(vii) Voltage |
: |
3.3 kV or 6.6 kV |
|
9. Step up Transformer
|
|
|
|
(i) Type |
: |
Outdoor type ONAN |
|
(ii) Quantity |
: |
4 |
|
(ii) Capacity |
: |
3.75 MVA |
|
(iii) Voltage Ratio |
: |
3.3 kV or 6.6 kV / 33 kV |
|
10. Speed Increasing Gearbox
|
|
|
|
(i) Speed on Turbine Side |
: |
107 rpm |
|
(ii) Speed on Generator Side |
: |
750 rpm |
|
11. Evacuation
|
|
|
|
(i) Nearest Sub-Station of BSEB |
: |
Uda-Kisunganj-Grid sub-station of BSEB is located approximately 10 KM from the powerhouse site |
|
(ii) Voltage level |
: |
Power will be generated at 3.3 kV or 6.6 kV and stepped-up to 33 kV for evacuation |
|
(iii) Transmission line |
: |
33 kV Double Circuit Transmission line laid on steel poles shall be constructed to evacuate the power from the switchyard of Arar Ghat power house upto Udakisunganj-Grid Sub-Station of BSEB |